top of page
TC Energy Plans 38.5 mile pipeline in Canada
2/19/2020
(Houston, TX) – A new natural gas pipeline is being proposed to be built north of Medicine Hat by TC Energy with an estimated potential of generating 500 jobs.
TC Energy is proposing the 38.5 mile pipeline to be located just north of Medicine Hat to meet increased demand for natural gas in the city and surrounding areas.
The project’s timetable estimates construction could start in the third-quarter of 2022 with an in-service date of 2023.
bottom of page